Ingyenes szállítás a Packetával, 19 990 Ft feletti vásárlás esetén
Posta 1 795 Ft DPD 1 995 Ft PostaPont / Csomagautomata 1 690 Ft Postán 1 690 Ft GLS futár 1 590 Ft Packeta 990 Ft

How Should the U.S. Air Force Depot Maintenance Activity Group be Funded?

Nyelv AngolAngol
Könyv Puha kötésű
Könyv How Should the U.S. Air Force Depot Maintenance Activity Group be Funded? Edward Geoffrey Keating
Libristo kód: 04733811
Kiadó RAND, január 1999
The authors find that a large portion of Air Force depot-level costs are unrelated to flying hours,... Teljes leírás
? points 53 b hamarosan hamarosan
8 343 Ft
Utánnyomás Megjelenés ismeretlen Megjelenés ismeretlen

30 nap a termék visszaküldésére


Ezt is ajánljuk


Saints and Sinners Edna O´Brien / Puha kötésű
common.buy 4 591 Ft
Marshes of Southwestern Lake Erie Louis W. Campbell / Puha kötésű
common.buy 15 750 Ft
hamarosan
Sleep Sheep Anna McQuinn / Puha kötésű
common.buy 2 826 Ft
American War Machine Peter Dale Scott / Kemény kötésű
common.buy 32 890 Ft
Invisible Engines Richard L. Schmalensee / Puha kötésű
common.buy 18 576 Ft
Policing World Society Mathieu Deflem / Kemény kötésű
common.buy 91 454 Ft
Microbiologically Safe Foods Jose Santos Garcia / Kemény kötésű
common.buy 82 251 Ft
Strange Creatures Gordon Lindsay Campbell / Kemény kötésű
common.buy 112 860 Ft
Africa-centred Knowledges Brenda Cooper / Kemény kötésű
common.buy 55 878 Ft
Managing Diversity in Corporate America Jefferson P. Marquis / Puha kötésű
common.buy 8 343 Ft
Stop All The Clocks Veronica St Clare / Puha kötésű
common.buy 8 783 Ft
Music, Criticism, and the Challenge of History Kevin C. Karnes / Kemény kötésű
common.buy 45 249 Ft
Mathetiger - Neubearbeitung 3. Schuljahr, Tiger-Trainer Matthias Heidenreich / Puha kötésű
common.buy 4 671 Ft
Educating All Students Together Leonard C. Burrello / Puha kötésű
common.buy 19 986 Ft

The authors find that a large portion of Air Force depot-level costs are unrelated to flying hours, so an alternative approach to budgeting and pricing is warranted to better link budgets and prices on the one hand and activity levels in the operating commands on the other. The authors examine how Air force Material Command (AFMC) depot-level expenditures relate to operating command activity levels, i.e., flying hours. They examine the recorded expenditures of AFMC's Depot Maintenance Activity Group (DMAG) and relate Mission Design-specific DMAG repair expenditures to various lags of fleet flying hours. They find, across a variety of weapon systems, that although both flying hours and DMAG repair expenditures for component repair vary considerably month-to-month, there is no consistent, cross-system relationship between the series. The apparent lack of systematic correlation between DMAG expenditures and fleet flying hours argues for an alternative approach to budgeting and internal pricing. Specifically, these results are consistent with multi-part pricing. Under such an approach, AFMC would receive a budget to pay for its fixed costs and operating commands would no longer face prices that include DMAG fixed costs that are unrelated to demands from the operating commands. [EK]

Ajándékozza oda ezt a könyvet még ma
Nagyon egyszerű
1 Tegye a kosárba könyvet, és válassza ki a kiszállítás ajándékként opciót 2 Rögtön küldjük Önnek az utalványt 3 A könyv megérkezik a megajándékozott címére

Belépés

Bejelentkezés a saját fiókba. Még nincs Libristo fiókja? Hozza létre most!

 
kötelező
kötelező

Nincs fiókja? Szerezze meg a Libristo fiók kedvezményeit!

A Libristo fióknak köszönhetően mindent a felügyelete alatt tarthat.

Libristo fiók létrehozása